Update 21/11/2009:
Car is finally back to my place for the big install. With the big help from Doug (DTrally) nothing wouldnt have happened without him doing most of the work. We firstly removed teh subframe as we had to install the NA cross member. Whilst doing so we cleaned all the suspension and surroundng parts remvoing any oil/grease etc..
Once engine installed, we attacked the interior. All the wiring harness, peddles heater boxes etc were all removed due to the engine shaving, it was a disaster place. Spent nearly a whole day installing the loom in the correct place, peddles etc etc. Also had to modify the new bigger 3/8th hardlines so we could fit everything in.. All is completed now but interior wont go in until all mechanical work is completed, I will get pics of the fuel lines once i change the carpet over.
Ive had enough for tonight. Still need to put all the wiring loom into the engine bay, route the loom for the fans, install resivior tanks, fuse box battery the list is endless, cosmetic stuff will wait til the car is completed sorted. But the car will go out on monday for exhaust fab and other things needed to be done, before the final checkup and run in tune hoepfully by friday or early the week after next.
Re-routed ABS unit and oil scavenge pump for turbo. All lines blingly items. Installed with the new brake resevior.