View Single Post
  #111  
Old 14-03-2012, 11:08 PM
ImPreSiV ImPreSiV is offline
Perth WRX Old Skool Cool Dude
Member
 
Join Date: Nov 2005
Location: Nowhere
Posts: 9,164
Thanks: 6
Thanked 55 Times in 47 Posts
ImPreSiV is a guruImPreSiV is a guru
Default

Quote:
Originally Posted by seagull View Post
The road works Roe hwy & Great-eastern hwy
some real tax payers money well spent on 250mm of hot mix in places.
Quote:
Originally Posted by GTB Liberty View Post
The roadworks for the new entrance to both domestic and international airports?

Probably be the 1st well designed new "flyover" freeway Section in Perth in decades.

However, this is WA they'll probably take 5 years to build it at 10 times the original budget.
Quote:
Originally Posted by forde View Post
He's talking about the one out midland way. I think 250mm is on the conservative side, have seen it a lot thicker in some spots!
You probably have no idea about road design. That intersection sees more heave haulage than any other in WA. It has to be that thick to cope with the constant heavy loads.

It should make a huge difference when done. It's been a long time coming. We surveyed it years ago and I'm sure it's our design being used.