Thread: NBN plan
View Single Post
  #10  
Old 11-09-2013, 01:49 PM
mavx4's Avatar
mavx4 mavx4 is offline
WRX Hi Five Club
Member
 
Join Date: Mar 2013
Location: Morley
Posts: 242
Thanks: 8
Thanked 7 Times in 7 Posts
mavx4 at standard level
Default

Quote:
Originally Posted by American Dave View Post
Massive cost overrun, only 2% rolled out in 5 years. The problem is that in its current design the NBN is the largest single civil construction project ever attempted in this country by a long ways. It was not costed or planned properly and no business plan produced prior to launching into it. Coalition to take axe to NBN Co
the "not costed" bit can be applied to the coalition's plan as well.
Looking at it the other way, the Coalition wants to implement a plan that will cost at least 2/3 of the original plan (I am just using the numbers they put forth) with at most 1/10th of the speed (assuming you live on top of a node), cost more to maintain, unreliable when it rains, incompatible with future upgardes and guaranteed to be obsolete in ten years.
__________________
02STi - Vipec, Oval Varex, APS CAI with K&N Filter, Walbro 255L, 53MM Koyorad & STD Coilover

19.5psi tune 271.6HP@6000 351.3NM@4700
Reply With Quote