View Single Post
  #999  
Old 29-04-2014, 07:55 AM
RoughStilin RoughStilin is offline
Sign me up!
Scoobie Doobie
 
Join Date: Jun 2010
Location: In a house
Posts: 804
Thanks: 1
Thanked 23 Times in 19 Posts
RoughStilin at standard level
Default

A quick update, a fair bit of progress has been made, although it never seems to be as quick as i'd like. The engine is now complete & ready to be dropped in. & the intercooler install is 70% complete too. I thought I would clean up the engine bay, after I removed the brake booster & clutch reservoir, due to going with a pedal box, as the engine bay just looked nasty.

Still heaps more work to do & with a few things I have got going on at the moment, progress will be a little slow over the next few moths I think. Installing the dry sump will be the most difficult part, but there are lots of other things that are time consuming tasks to do on the car.

Here are a few pics for those interested, of what I have been up to over the last couple of weeks with the intercooler install & also the ,engine bay clean up.











__________________
Cheers,

Simon.
Reply With Quote