Can confirm there is a third runway to be built over the existing area. Unknown date this is likely to start construction, maybe late 2017 / early 2018.
__________________
MY01 JDM EVO VII - 230KW / 430NM @ 1.6BAR
Last edited by Dan [GTI]; 15-12-2015 at 01:13 PM.
|