Love this thread, great work.
|
2 Attachment(s)
Top gauge panel done now onto the lower panel and shifter surround.
[ATTACH]14895[/ATTACH] [ATTACH]14896[/ATTACH] |
5 Attachment(s)
A couple of goodies rocked up today for a build I'm doing .
[ATTACH]14965[/ATTACH] [ATTACH]14966[/ATTACH] [ATTACH]14967[/ATTACH] [ATTACH]14968[/ATTACH] [ATTACH]14969[/ATTACH] |
Is that the revised oil baffle plate ?
|
Yes I asked for the Latest version .
|
5 Attachment(s)
Couple more things done . Killer B stuff fitted and some heat shielding started .
[ATTACH]14974[/ATTACH] [ATTACH]14975[/ATTACH] [ATTACH]14976[/ATTACH] [ATTACH]14977[/ATTACH] [ATTACH]14978[/ATTACH] |
5 Attachment(s)
So progressed a little further today with the 207 freshen up , still waiting for injectors to come then I can do the intake manifold and plumbing .
Installed and painted sump some heat shielding . The timing belt and hoses behind the covers replaced and cleaned up covers put back on. [ATTACH]14979[/ATTACH] [ATTACH]14980[/ATTACH] [ATTACH]14981[/ATTACH] [ATTACH]14982[/ATTACH] [ATTACH]14983[/ATTACH] |
1 Attachment(s)
Also had my Aircon delete bracket and firewall bung show up from the US cheers Daz for putting me on to these guys saved me some coin and bracket looks factory.
[ATTACH]14984[/ATTACH] |
3 Attachment(s)
More goodies FTW 1200cc
[ATTACH]14989[/ATTACH] [ATTACH]14990[/ATTACH] [ATTACH]14991[/ATTACH] |
2 Attachment(s)
Fuel rails and injectors fitted up.
[ATTACH]14993[/ATTACH] [ATTACH]14994[/ATTACH] |
All times are GMT +8. The time now is 10:07 AM. |
Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO