|
|
LinkBack | Thread Tools | Display Modes |
#11
|
||||
|
||||
Thanks for info guys.
House is owned in embelton (6+yrs so no issue with tax) i think its zoned r2.5 would be better if thats changed so i can get more blocks out. 1. Not connect to sewage although it is in the area. 2. No underground power. 3. Not clay just soil asfaik 4. Go green title if possible (1400 sqm block) 5. House not going to be demolished at present time just wanting to sell off a bit of land. 6. Not wanting to build just divide and sell.
__________________
I'm a jockey kunts... |
#12
|
||||
|
||||
Might want to see someone about that.
__________________
[SIGPIC][/SIGPIC] |
#13
|
||||
|
||||
Doubt it is zoned R2.5, most of Embelton is between R17.5-R40. R number is allowable lots per Hectare i.e. smallest lot size with R20 is 500sqm (10,000sqm/20).
You can look up zoning here Interactive City Maps | City of Bayswater Go Maps>Town Planning Scheme
__________________
Range Rover Evoque Si4 Dynamic |
#14
|
||||
|
||||
R25
__________________
Wide Body GC8 WRX #217 Street Cars WA Full 04 STi drivetrain 08 JDM 207 Garrett 3076 xtr |
#15
|
||||
|
||||
First thing to do is work out how close the sewer is to the property - can't subdivide without it & most of the cost will be dependant on this answer.
__________________
MY09 Evo X - 1.6bar@3500rpm - got lag? Barbagallo - 56.03 (S); 1:08.09 (L) Collie - 50.77 Possibly the most under-driven Evo X in the world?? |
#16
|
||||
|
||||
Quote:
Sewerage is right at the bottom of the property not too far away asfaik.
__________________
I'm a jockey kunts... |
#17
|
||||
|
||||
<10m, 10m-50m, >50m???
Do a dial before you dig seach & request service plans you tight arse!
__________________
MY09 Evo X - 1.6bar@3500rpm - got lag? Barbagallo - 56.03 (S); 1:08.09 (L) Collie - 50.77 Possibly the most under-driven Evo X in the world?? |
#18
|
|||
|
|||
I don't know anything about it. Yeah its better if you consult with a builder or a related lawyer. He can help you better than us. Hope he will charge nothing for counselling.
Home Builders in Brisbane Last edited by Lamees; 05-10-2013 at 11:46 PM. |
#19
|
||||
|
||||
going through this process now, how hard or practical is it to get water corp head works/sewage and western power green dome done in advance of the wapc 90 day wait period?
__________________
Long live the WRC |
#20
|
||||
|
||||
They won't budge on paper work until WAPC approval is issued.
__________________
MY09 Evo X - 1.6bar@3500rpm - got lag? Barbagallo - 56.03 (S); 1:08.09 (L) Collie - 50.77 Possibly the most under-driven Evo X in the world?? |
Tags |
costs, dividing, land, sun |
|
|